For the upcoming
week of January 19, 2004, the following construction activities
will take place:
- Vinyl tile
installation level D.
- Ceramic
Tile installation - Bathrooms.
- Ceiling
Grid installation.
- D Level
Millwork (operatory casework) arrival and installation.
- Rolling
counter top doors - D and B Level reception desks.
- Curtainwall
and Glass installation.
- Sheetrock
and taping 'D' and 'B' level.
- Painting
- Door frames and walls
- Metal Panel
installation continuing.
- Louver
Installation.
- Lighting
installation 'D' level
- Grills
and diffuser installation 'D' level